Elite CSW200UL Spécifications Page 19

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 54
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 18
18
O
f
f
Off
O
f
f
Off
OnOn
O
n
On
O
n
On
OffOff
O
f
f
Off
O
f
f
Off
OnOn
OffOff
OffOff
CSW-200 (1)
CSW-200
(2)
Main
Room
Eug. Dept.
Manu. 1 Rm
M
a
i
n
D
e
p
t
.
M
a
n
u
.
2
R
m
Air (1)
Conditioner
Air (2)
Conditioner
C
o
n
f
e
r
e
n
c
e
R
o
o
m
1
C
o
n
f
e
r
e
n
c
e
R
m
2
,
3
R
e
f
e
r
.
B
u
s
1
,
2
,
3
Conference
Room 2
Co
m
p
.
S
er
ve
2
C
o
m
p
.
S
e
r
ve
1
HOW TO CONNECT POWER (110V)
Use U.L. Listed Conduit for
Supplying Power to the Unit
Suggestion:
Do Not Use This Outlet Unless You Are
An Authorized Service Technician
Gate Operator MUST be Properly Grounded
White Wire (Neutral)
Black Wire (110 Vac)
Green Wire (Ground)
W
4
OFF
O
N
OFF
O
N
Earth Ground Rod Installation
The earth ground rod must be located within 3 feet from the gate
operator.
Use the proper type earth ground rod for your local area.
The ground wire
must
be a single, whole piece of wire.
Never
splice two
wires for the ground wire. If you should cut the ground wire too short,
break it, or destroy its integrity, replace it with a single wire length.
12 gauge wire
Proper grounding gives an electrical charge, such as from an electrical static
discharge or a near lightning strike, a path from which to dissipate its energy safely
into the earth.
Without this path, the intense energy generated by lightning could be directed
towards the Elite gate operator. Although nothing can absorb the tremendous power
of a direct lightning strike, proper grounding can protect the gate operator in most
cases.
Not responsible for improper installation or failure to comply with
all necessary local building codes.
8 ft
Before digging more than 18" deep, contact local underground utility locating companies.
Avoid damaging gas, power, or other underground utility lines.
Seal all open holes of
electronic box with
sealant when finished
wiring.
Minimum: 20-amp
breaker switch per
operator needed.
How to Connect Power
Caution: Not responsible for conflicts between the information listed in the above chart and the requirements of your local building codes.
The information is for suggested use only. Check your local codes before installation.
16 Gauge
150 Feet
75 Feet
14 Gauge
250 Feet
125 Feet
12 Gauge
400 Feet
200 Feet
10 Gauge
650 Feet
325 Feet
8 Gauge
1000 Feet
500 Feet
4 Gauge
2200 Feet
1100 Feet
Wire Gauge Requirement for 110 Vac Power Supply
1/2 HP and Dual Motor
1 HP
Important: A factory installed heater must be wired into the power supply. See page 33.
W
4
O
F
F
O
N
CSW200A Manual.qxd 12/9/04 3:11 PM Page 18
Vue de la page 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 53 54

Commentaires sur ces manuels

Pas de commentaire